Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) TikTok Instagram YouTube Spotify
    UOWTV
    • Home
    • Media
    • News
      • Arts & Culture
      • Govt & Politics
      • Sport
      • Tech & Research
    • Features
    • Podcasts
      • A Day In The Life Of…
      • Between the Mountains and the Sea
      • Beyond The Bubble
      • Early Start Expert Insight
      • Miks and Mads
      • The Buzz
      • What Can We Say Again?
    • RadioU
    • Alumni Stories
    • About
    • Contact
    UOWTV
    Home»News»GPT’s New Wollongong Central Opening
    News

    GPT’s New Wollongong Central Opening

    Sarah NavinBy Sarah NavinOctober 10, 2014Updated:October 10, 2014No Comments2 Mins Read

    Well kids, we didn’t think we’d see the day the mall opened, after dodging orange cones and being shuffled through fencing for years, but yesterday the new Wollongong Central flung open its doors for the first day of trading. Good riddance to the construction chaos!

    A giant slippery dip, teacup rides, a few snakes and crocodiles and a celebratory cake were thrown in the mix, to welcome thousands of eager shoppers ready to splurge on the new additions to the mall (hello Targét!)

    My Kitchen Go Rules contestants were presenting cooking demonstrations outside Coles, while a Tai Chi session and Ukulele band provided some entertainment outside. Retailer’s mascots were aplenty and the ceremonial ribbon-cutting welcomed the cha-ching of cash registers, all building up to the DJ – fire twirling – laser and light show – extravaganza last night at 8pm.

    The new mall has provided an estimated 800 new retail jobs, a welcoming employment boost to the region. With 19,000 square metres of retail space, the mall features 752 steel blades framing the main entrance, hundreds of rolling pins and silver pasta strainers covering the walls and ceiling on the bottom food level, as well as bright floor tiles from Spain.

    The mall is sadly still missing one shining light… Max Brenner. Its prominent front and centre position is still under construction – but sit tight chocoholics, hopefully not long until the bald man joins us.

    See the construction time lapse from December 2011 here. What do we think? $200 million well spent?

    Follow on Facebook Follow on Instagram Follow on TikTok
    Share. Facebook Twitter LinkedIn Threads Bluesky Email Copy Link
    Sarah Navin

    Related Posts

    UOW journalism alum urges students to explore the industry

    August 13, 2026

    ‘No seat at the table’: Lane Cove residents oppose ‘Project Mars’ data centre

    August 12, 2026

    Disability support qualification could become mandatory requirement

    August 12, 2026
    OUR NETWORK
    • Facebook
    • Twitter
    • Instagram
    • YouTube
    • TikTok
    • Spotify
    LATEST NEWS

    UOW journalism alum urges students to explore the industry

    August 13, 2026

    ‘No seat at the table’: Lane Cove residents oppose ‘Project Mars’ data centre

    August 12, 2026

    Disability support qualification could become mandatory requirement

    August 12, 2026

    New high school for Shellharbour sparks local optimism

    August 12, 2026

    New Flood Plan Targets Risks in Northern Suburbs of the Illawarra

    August 12, 2026

    Wollongong dance crews place 10th at World Hip Hop Championships

    August 12, 2026
    TikTok Facebook X (Twitter) Instagram YouTube Spotify
    © 2026 UOWTV.com

    Type above and press Enter to search. Press Esc to cancel.